$7.5 million in annual road logistics savings potential, including a shift from rail to road
Mining
Strategy and transformation
CIS countries
$1 million in annual cost savings at an apatite concentrate processing plant in Russia
Mineral Processing
Operational efficiency
Russia
Reducing coal mine overheads
Mining
Operational efficiency
Russia
Reducing unplanned downtime on an upgraded production line
Mineral Processing
Operational efficiency
Russia
Reducing operating costs at a gold mining operation in Africa
Mining
Operational efficiency
Other countries
Supporting a company’s transformation planning to improve operational performance
Mining
Operational efficiency
Other countries
Making the employer more attractive: a programme of 315 initiatives developed to reduce occupational health hazards and improve working conditions across 210 occupations
Metallurgy
Mining
Strategy and transformation
Russia
A 20–60% increase in coal terminal handling productivity
Port Infrastructure
Operational efficiency
Russia
Identified potential to increase the NPV of an underground non-ferrous metals mine expansion project by 276%
Mining
Capital project performance
Russia
The initiatives developed helped increase the mining project’s NPV by RUB 48 billion
Mining
Capital project performance
Russia
12% increase in mine output through processes and digital tools for integrated mine planning and control
Mining
Process digitalisation
Russia
$180 million increase in EBITDA through cost reductions at an open-pit coal mine
Mining
Mineral Processing
Operational efficiency
Detailed benchmarking identifies potential to increase labour productivity by 50–180% at a Russian coal mining operation
Mining
Operational efficiency
Russia
RUB 360 million in additional annual financial benefits from optimising the polymer grade production cycle at a petrochemical plant
Oil and Gas
Strategy and transformation
Russia
Delivery times for strategic capital projects cut by 2–3 months by improving the management system of a Russian non-ferrous metals producer's capital projects department
Mining
Capital project performance
Russia
Potential identified to improve copper and molybdenum recovery by 0.5–1 percentage point at a flotation plant
Mineral Processing
Operational efficiency
CIS countries
Developing and implementing an automated system for 10-day planning and issuing work assignments
Mining
Process digitalisation
Russia
Increasing coal output by 10% above baseline through the development of an underground transport concept
Mining
Strategy and transformation
Russia
A 3% increase in EBITDA through the development of a functional strategy for a major gold mining company’s operations division
Mining
Strategy and transformation
Russia
Increasing NPV by 60% at a major Russian fuel company by developing an effective fuel supply strategy
Oil and Gas
Strategy and transformation
Reducing construction time by 230 days for a processing plant in the CIS
Mineral Processing
Capital project performance
CIS countries
Reducing delivery risks on a multibillion steelworks reconstruction project for the CIS’s largest steel producer
Metallurgy
Capital project performance
Russia
Identifying potential to increase NPV by 37% for an iron ore mine expansion project in Russia
Mining
Operational efficiency
Russia
Reducing major maintenance shutdown duration by 14–33% in three production units at a mineral fertiliser plant in Russia
Chemicals
Operational efficiency
Russia
Identifying $200 million in potential value through a transformation programme for a chemical company’s project management office
Chemicals
Operational efficiency
Russia
Organisational and technical improvements increased recovery by 4 percentage points at a processing plant in Russia
Mineral Processing
Operational efficiency
Russia
Bringing a new gold processing plant in Russia into operation 51 days sooner
Mineral Processing
Capital project performance
Shortening the critical path by 78 days for a polymetallic ore processing plant modernisation programme in Russia
Mineral Processing
Capital project performance
Russia
Increasing contractor workforce productivity by 118% on a processing plant expansion project in Russia
Mineral Processing
Capital project performance
Russia
Increasing the number of vacancies filled by 20% in 8 weeks in the capital projects department at a remote operation of a major vertically integrated non-ferrous metals producer
Mining
Capital project performance
Russia
Increasing output by 30% at an underground mine through business improvements and a planning system
Mining
Operational efficiency
Russia
112% increase in mine development rates at Russia’s largest underground mine
Mining
Operational efficiency
Russia
10% increase in output at Russia’s largest underground mine
Mining
Operational efficiency
Russia
Flotation circuit construction shortened by 3 months and contractor cost estimates reduced by 30% at a coal preparation plant in Russia
Mineral Processing
Capital project performance
Russia
14% faster progress on the critical path through weekly work planning
Metallurgy
Capital project performance
Russia
2.1 percentage-point increase in concentrate yield and flotation circuit start-up brought forward by 30 days at a coal preparation plant in Russia
Mineral Processing
Operational efficiency
Russia
20% increase in mine development rates through daily reviews of development crews’ late arrivals and early departures
Mining
Operational efficiency
Russia
Identifying the potential to increase mine development rates by 61% at a coal mining operation
Mining
Operational efficiency
Russia
53% improvement in a safety indicator by linking it to financial incentives
Mining
Operational efficiency
Russia
48% increase in mine development rates through the “Ideal Cycle” tool and supporting initiatives
Mining
Operational efficiency
Russia
5S workplace organisation score increased from 31% to 71% through scheduled walkarounds and feedback
Mining
Operational efficiency
Russia
14% increase in net conveyor operating time by improving daily performance review meetings
Mining
Operational efficiency
Russia
40% reduction in downtime caused by material delivery delays through a standard procedure for replacing suspended monorail track beams
Mining
Operational efficiency
Russia
19% increase in mineral fertiliser output at a Russian plant
Chemicals
Operational efficiency
Russia
Processing plant construction time reduced by 90 days through risk assessment and management tools
Mineral Processing
Capital project performance
CIS countries
$200 million increase in the NPV of a metallurgical plant’s capital project portfolio, with a lower investment budget for the same projects
Metallurgy
Capital project performance
Potential identified to increase overburden removal by 23% at an open-pit coal mine in Kazakhstan
Mining
Operational efficiency
CIS countries
Potential identified to bring a new longwall face into production 132 days earlier by increasing the mine development rate by 86%
Mining
Operational efficiency
Russia
Programme developed to increase fertiliser output by 14% for a major ammonium nitrate producer in Russia
Chemicals
Operational efficiency
Russia
6.5% cost reduction through negotiations with contractors to lower existing road haulage rates
Mining
Operational efficiency
Russia
7.6-percentage-point increase in recovery at a gold flotation plant
Mineral Processing
Operational efficiency
Russia
11.4% increase in apatite concentrate throughput through improved maintenance performance
Chemicals
Operational efficiency
Major maintenance shutdown duration reduced by 12.9% at a phosphoric acid operation in Russia
Chemicals
Operational efficiency
Potential to increase throughput by 11% and recovery by 0.6 percentage points at a copper–nickel processing plant, with total benefits of up to RUB 75 billion
Mineral Processing
Operational efficiency
Russia
3% increase in processing plant equipment availability through digital data collection tools
Mineral Processing
Operational efficiency
Russia
Potential identified to reduce direct costs by 5% for a major fertiliser producer in Russia
Chemicals
Operational efficiency
Russia
270 fewer safety and quality issues on a construction project for a chemicals group
Chemicals
Capital project performance
Russia
Potential identified to increase productivity by up to 14% at an underground mine
Mining
Operational efficiency
Russia
Potential identified to increase productivity by 12–19% at a phosphate fertiliser plant
Chemicals
Operational efficiency
Russia
Identifying potential to significantly improve an open-pit mine’s profitability by more than RUB 800 million a year
Mining
Capital project performance
Russia
Developing a renewable power transition strategy with positive NPV and a reduction in CO₂ emissions of 70,000 tonnes a year
Mining
Strategy and transformation
Russia
Identifying $8.5 million in potential benefits from shorter well workovers for an oil producer
Oil and Gas
Operational efficiency
CIS countries
Developing a plan to optimise the operating model of four functions for a vertically integrated mining and metals company
Mining
Strategy and transformation
Reducing longwall support relocation time by 9% at a coal mine in Russia
Mining
Operational efficiency
Russia
Increasing development rates by 70%–180% at a coal mine in Russia
Mining
Operational efficiency
Russia
Recommendations to improve digital product development and implementation and strengthen adoption within a major coal producer’s management system
Mining
Process digitalisation
Russia
Identifying potential to increase EBITDA by 10% through a portfolio of initiatives at the company’s gold mining asset
Mining
Operational efficiency
CIS countries
Implementing a construction project management system and shortening a federal highway’s construction schedule by 100 days
Capital project performance
Russia
Reducing logistics costs by RUB 2.2 billion a year through better sales planning at a major petrochemical company
Oil and Gas
Strategy and transformation
Russia
Improving adherence to the 10-day work plan by 16% at a large underground nickel mine
Mining
Process digitalisation
Russia
Improving adherence to the monthly mining plan by more than 50% through a monthly work schedule
Mining
Process digitalisation
Russia
A $100 million increase in NPV for a fertiliser producer’s mining asset development project in Russia
Chemicals
Capital project performance
Russia
An additional $15 million in net cash flow at a polymetallic ore processing plant in Kazakhstan
Mineral Processing
Operational efficiency
CIS countries
A 51% increase in mineral fertiliser production at a plant in Russia
Chemicals
Operational efficiency
Russia
Developing an operating model for a contractor specialising in underground mine capital works
Mining
Strategy and transformation
Identifying potential to increase blister copper production by 10% and recovery by 0.5 percentage points at a major Russian metallurgical complex
Mining
Operational efficiency
Russia
Reducing the unspent capital budget for construction of a mining and processing operation by 36%
Mining
Capital project performance
Russia
Potential to increase throughput by 25% without capital expenditure at a port in Russia
Port Infrastructure
Operational efficiency
Russia
A 15 percentage point increase in mobile equipment availability at an underground mine in Russia
Mining
Operational efficiency
Russia
A 50% reduction in concentrate losses at a fertiliser producer
Mineral Processing
Operational efficiency
Russia
Identifying potential to increase an underground mine’s NPV by 35%
Mining
Operational efficiency
CIS countries
Reducing operational and technical downtime through data collection and variance reviews
Mining
Operational efficiency
CIS countries
Increasing mine production by more than 10% in 3 months by improving financial incentives
Mining
Operational efficiency
CIS countries
Increasing concentrate yield by 1.3% and improving concentrate quality at a coal preparation plant
Mineral Processing
Operational efficiency
Russia
Increasing zinc concentrate output at a processing plant by 45%
Mineral Processing
Operational efficiency
CIS countries
Increasing production at an underground lead-zinc mine by 80%
Mining
Operational efficiency
CIS countries
Reducing valuable mineral losses during processing by 15% through regular KPI variance reviews
Mineral Processing
Operational efficiency
Russia
Increasing the production rate at an underground mine by 48% by introducing a mining work schedule
Mining
Operational efficiency
CIS countries
Increasing mineral fertiliser output at a Russian plant by 20%
Chemicals
Operational efficiency
Russia
Increasing longwall productivity at a Russian coal mine by 16%
Mining
Operational efficiency
Russia
Improving the management system and developing measures to shorten construction by 10 months on a processing plant capacity expansion project at a copper-molybdenum mining and processing operation in the CIS
Mineral Processing
Capital project performance
CIS countries
Identifying potential to increase throughput at a CIS processing plant by 1.5–3 million dry metric tonnes per year
Mineral Processing
Operational efficiency
CIS countries
Increasing project NPV by 320% over baseline for an 8-million-tonne throughput expansion at a copper-molybdenum mining and processing operation in the CIS
Mining
Capital project performance
CIS countries
Identified potential to shorten major maintenance shutdowns at sulphuric acid plants for mineral fertiliser production by 31%
Chemicals
Operational efficiency
Russia
Identified the hidden logistics cost base in procurement contracts and potential to reduce it by 5–12%
Mining
Operational efficiency
Russia
Increasing rock movement by setting achievable, measurable shift targets
Mining
Operational efficiency
Russia
Reduced the delay in submitting documentation for expert review by 30 days on a gold processing plant construction project
Mineral Processing
Capital project performance
Russia
Increasing project NPV by more than $200 million through optimised mine planning for a major phosphate producer
Mining
Capital project performance
CIS countries
Cut procurement lead times for construction and installation works by 30 days, with 12 companies registered in advance to bid for a gold processing plant project in Russia
Mineral Processing
Capital project performance
Russia
Increasing underground lead-zinc ore production by 23% and deposit NPV by 9% through digital tools implemented by our team
Mining
Process digitalisation
Developing a digitalisation-focused functional strategy for the operations division of a major Russian mining company
Mining
Process digitalisation
Russia
Increasing gold processing plant throughput by 6.5% through more effective maintenance
Mineral Processing
Operational efficiency
Russia
Processing plant exceeded its budgeted targets despite a 2.5% shortfall before the project and a 5-day weather-related force majeure shutdown
Mineral Processing
Operational efficiency
Russia
Halving unaccounted-for losses of the valuable component
Chemicals
Operational efficiency
Russia