All case studies
16.09.2026
+900 kg of gold a year: diagnostic review and improvement roadmap for a regional division of a major gold producer
12.08.2026
Operational due diligence for a top-10 international gold producer: how to identify $500 million in operational improvements

A 15 percentage point increase in mobile equipment availability at an underground mine in Russia

Vladimir
Vladimir
Senior Partner

Situation

Our client, a vertically integrated Russian phosphate fertiliser producer, aimed to increase production, but load-haul-dump machine (LHD) availability was a constraint. Our team was engaged to increase the available operating time of mobile equipment.

What we did

  • Developed and implemented equipment total cost of ownership models, criteria for retiring and replacing equipment, and a maintenance strategy for mobile equipment.
  • Revised shift servicing and maintenance planning procedures.
  • Established controls to ensure regular lubrication, the creation and replenishment of emergency spare parts stocks, the transition to component-exchange repairs, and the development of maintenance personnel’s skills.
  • Established the business case for equipment rebuilds.
  • A 15 percentage point increase in mobile equipment availability.
  • An additional 4,000 engine hours of LHD service life.

LHD availability, %

LHD availability rises from a baseline of 68% to 83% in month 4.

× Enlarged image

Read Pieff
on social media

Practical case studies and current events. Business development tools and methods. Expert analysis and people’s stories.