Situation
Our client, a vertically integrated Russian phosphate fertiliser producer, aimed to increase production, but load-haul-dump machine (LHD) availability was a constraint. Our team was engaged to increase the available operating time of mobile equipment.
What we did
- Developed and implemented equipment total cost of ownership models, criteria for retiring and replacing equipment, and a maintenance strategy for mobile equipment.
- Revised shift servicing and maintenance planning procedures.
- Established controls to ensure regular lubrication, the creation and replenishment of emergency spare parts stocks, the transition to component-exchange repairs, and the development of maintenance personnel’s skills.
- Established the business case for equipment rebuilds.
- A 15 percentage point increase in mobile equipment availability.
- An additional 4,000 engine hours of LHD service life.