Situation
Our client, a Russian holding company, was considering different investment options to increase throughput at its port asset. Our team was engaged to assess the alternatives and develop a scenario that would maximise productivity gains with the lowest possible investment.
What we did
- Redesigned the port’s internal logistics.
- Optimised shift handovers.
- Improved equipment availability.
- Introduced operational KPIs and refined the incentive system.
- Avoided purchasing two portal cranes by implementing operational improvements.
Results
- Potential to increase throughput by 25% without capital expenditure.
- A $5.5 million reduction in capital expenditure.
Port capacity, million tonnes/year; % of baseline