Operational due diligence for a top-10 international gold producer: how to identify $500 million in operational improvements
29.07.2026
16% lower operating costs for shared e-scooter fleet repairs
16.09.2026

+900 kg of gold a year: diagnostic review and improvement roadmap for a regional division of a major gold producer

Vladimir
Vladimir
Senior Partner
Anatoly
Anatoly
Associate Partner

Situation

A major gold producer launched an operational transformation of one of its operating divisions. Management had two priorities: bring every asset into profit in the short term, and initiate changes to increase gold production severalfold over the medium term. To assess the issues systematically and identify opportunities for growth, the Pieff team conducted a high-level operational diagnostic review and defined the main areas for improvement at 4 mining and processing operations.

Results

What we did:

  • Developed a ranked list of improvement opportunities with a combined potential of up to 900 kg of additional gold a year.
  • Analysed the end-to-end production chain, from geological planning to finished product.
  • Conducted interviews with managers and technical specialists, analysed operating data and observed processes directly at open pits, underground mines and processing plants.
  • Developed a high-level roadmap for change.

The key improvement levers were grouped into 4 areas:

  • Improving ore quality — geological model reconciliation, reproducibility of laboratory assays, NPV-based pit limit optimisation, and reducing dilution and ore losses.
  • Improving mining and haulage performance — optimising maintenance and repair planning, improving dispatching, and increasing excavator and haul truck utilisation.
  • Improving recovery at gold processing plants — managing ore blending, mine-to-mill optimisation, and maintaining control of operating parameters.
  • Reducing regulatory risks — securing approval of permitting documentation and undertaking additional design work.
Seven-month improvement roadmap covering programme launch, quick wins at three assets and systemic changes.Assessment of 500–900 kg of additional annual gold output and a six-level management system assessment.