Situation
A major gold producer launched an operational transformation of one of its operating divisions. Management had two priorities: bring every asset into profit in the short term, and initiate changes to increase gold production severalfold over the medium term. To assess the issues systematically and identify opportunities for growth, the Pieff team conducted a high-level operational diagnostic review and defined the main areas for improvement at 4 mining and processing operations.
Results
What we did:
- Developed a ranked list of improvement opportunities with a combined potential of up to 900 kg of additional gold a year.
- Analysed the end-to-end production chain, from geological planning to finished product.
- Conducted interviews with managers and technical specialists, analysed operating data and observed processes directly at open pits, underground mines and processing plants.
- Developed a high-level roadmap for change.
The key improvement levers were grouped into 4 areas:
- Improving ore quality — geological model reconciliation, reproducibility of laboratory assays, NPV-based pit limit optimisation, and reducing dilution and ore losses.
- Improving mining and haulage performance — optimising maintenance and repair planning, improving dispatching, and increasing excavator and haul truck utilisation.
- Improving recovery at gold processing plants — managing ore blending, mine-to-mill optimisation, and maintaining control of operating parameters.
- Reducing regulatory risks — securing approval of permitting documentation and undertaking additional design work.