Identifying potential to increase an underground mine’s NPV by 35%

Situation

Our client, the operator of a zinc deposit in the CIS, aimed to optimise the operation’s NPV. We were engaged to conduct a diagnostic, develop an optimal life-of-mine production profile, and identify measures to maximise the NPV of the deposit as a whole.

What we did

  • Analysed development options and production constraints, and identified the drivers of NPV.
  • Modelled an NPV scenario incorporating operational improvements—increased throughput at the underground mine and processing plant—with a total uplift of 24% against the base case.
  • Proposed changes to the mining sequence for the deposit’s blocks, taking into account plans to develop new levels, equipment acquisition plans, ventilation constraints on each level and other factors.
  • Held idea-generation sessions to address future production constraints and prioritised 3 NPV improvement initiatives with a maximum additional uplift of 11%. All the initiatives enabled the mine to increase production and mine out the deposit sooner.

Results

  • Identified potential to increase project NPV by 35%.

Identified potential to increase NPV

NPV waterfall showing a potential 35% increase from operational improvements and capital investment initiatives.

× Enlarged image

Read Pieff
on social media