Situation
Our client, a major Russian metallurgical complex, was falling short of its annual blister copper production plan because of declining raw material quality. Strict limits on atmospheric SO2 emissions restricted its options for increasing throughput. We were engaged to carry out a preliminary assessment of opportunities to improve operational performance.
What we did
- Analysed the main production stages, established baseline and potential performance, and identified the bottleneck: the smelting complex.
- Identified the main constraint on realising the potential: the need to increase the gas load on the sulphuric acid plant.
- Carried out observations in the production areas and more than 10 types of data analysis to develop improvement initiatives.
- Calculated the total financial benefits of the proposed initiatives and agreed them with the economics department.
- Assessed the production management system and developed key recommendations.
Results
- Identified potential to increase blister copper production by 10%.
- Identified potential to increase recovery by 0.5 percentage points.
Capacity balance, thousand tonnes of blister copper