Situation

Our client, a major mining and metals company, needed to increase output from its mines. The processing plant and metallurgical plant had greater processing capacity than the mines could supply. The largest mine extracted three ore types using different mining methods according to geological conditions. Our team was invited to carry out a diagnostic review and identify ways to increase the mine's production potential.

What we did

  • Built driver trees for the main processes: backfilling, drill and blast, load-haul-dump machine operations, rail haulage and skip hoisting
  • Analysed downtime and opportunities to improve productivity in each process
  • Established that the mine's services—ventilation, water and power supply—had sufficient capacity and did not constrain production potential
  • Identified drill and blast and haulage as the two competing bottlenecks

Results

  • 14% increase in potential mine output

Potential identified across different areas of the mine (Stage 1), million tonnes per year

Actual and potential capacity across mine processes, with a target output increase of 14%