Situation
Our client, a Russian coal mining company, wanted to accelerate development at its mines. A range of organisational and technical factors had caused development rates to fall significantly, resulting in a shortfall against budgeted production. Inefficiencies had also been identified in the management of longwall equipment relocations, along with opportunities to increase output by 8–11%. Our team was engaged to identify the priority initiatives for improving operational performance at the asset.
What we did
- Analysed the current situation in detail and identified the main areas for improvement.
- Analysed, assessed and prioritised “quick wins” and the first and second waves of improvement initiatives.
- Developed value driver trees (VDTs) to identify the key levers for increasing development rates and production volumes.
- Analysed cost drivers in detail and identified opportunities to reduce costs.
- Identified ways to shorten longwall equipment relocations.
Results
- Potential increases of 49% to 61% in mine development rates across two areas.
Potential increase in mine development rates, metres per month
