All case studies
16.09.2026
+900 kg of gold a year: diagnostic review and improvement roadmap for a regional division of a major gold producer
12.08.2026
Operational due diligence for a top-10 international gold producer: how to identify $500 million in operational improvements

Identifying potential to significantly improve an open-pit mine’s profitability by more than RUB 800 million a year

Vladimir
Vladimir
Senior Partner

Situation

During a project for a major Russian mining and chemicals group to optimise its mining assets, review its capital programme and improve operational performance, it became necessary to review the production profile of one of the client’s mines. At the start of the project, the mine was loss-making and the client planned to place it on care and maintenance.

What we did

  • Assessed the mine’s operational performance and developed a set of initiatives to improve productivity.
  • Analysed the existing approach to mining the deposit and developed an optimal production profile, taking account of its geological characteristics, including orebody geometry and grade. Proposals included establishing an in-pit waste dump and changing the mining sequence of the blocks.

Results

  • Identified potential to increase the mine’s profit by RUB 800–900 million a year.

Changes in profit at one of the mines, RUB million

Waterfall chart showing potential mine profit improvements of RUB 800–900 million.

× Enlarged image

Read Pieff
on social media

Practical case studies and current events. Business development tools and methods. Expert analysis and people’s stories.