All case studies
16.09.2026
+900 kg of gold a year: diagnostic review and improvement roadmap for a regional division of a major gold producer
12.08.2026
Operational due diligence for a top-10 international gold producer: how to identify $500 million in operational improvements

20% increase in mine development rates through daily reviews of development crews’ late arrivals and early departures

Anton
Anton
Senior Partner
Yury
Yury
Associate Partner

Situation

Our client, a large Russian mining and metals company, needed to increase mine development rates to prepare production faces. We were engaged to identify the main levers for accelerating development and implement corrective actions.

What we did

  • Identified shift-change delays as the main opportunity to increase development rates.
  • Developed a model to analyse data from the Flexcom positioning system and calculate the time lost to late arrivals and early departures.
  • Optimised the schedule for crew transport vehicles.
  • Worked with the mine transport team to eliminate delays to underground diesel locomotive services.
  • Introduced posters in development areas explaining the disciplinary measures for arriving late at or leaving early from the workplace.
  • Introduced daily reviews of late arrivals and early departures at morning meetings.

Results

  • 20% increase in mine development rates.

Example of a report for tracking shift-change delays

Positioning-system report showing development crews’ arrival and departure times, lateness and early departures; names are blurred.

× Enlarged image

Read Pieff
on social media

Practical case studies and current events. Business development tools and methods. Expert analysis and people’s stories.