Situation
Our client, a large underground mine, wanted to increase production. Our team was brought in to help identify the bottleneck and unlock the mine’s potential.
What we did
- Created a driver tree for ore haulage volumes and established a baseline for every underlying KPI.
- Used the driver tree to develop a calculator enabling the section manager to quickly set shift tonnage targets for each mine dosing bunker and ore pass.
- Introduced a revised load–haul–dump (LHD) machine operator’s shift sheet, with the plan entered before the start of the shift and actual performance recorded by the shift supervisor at the end.
Results
- 4% increase in haulage volume.
Example of the tool