Our client, an open-pit gold mining operation in Africa, had depleted most of its reserves and was awaiting approval for a project that would extend the pit’s life by 10 years. Management was tasked with reducing costs while maintaining production capacity until the revised project was approved and launched. Our team was engaged to conduct a diagnostic review, evaluate alternative mining and processing options to extend the remaining operating life, and develop cost reduction initiatives and an implementation roadmap.

Situation/problem:
The geology team marks out mining blocks in the pit using a block model supplemented by field mapping and face marking. However, the resulting boundaries may not suit the equipment’s operating parameters and can be impractical to mine, leading to additional dilution or metal losses.
Solution:
We developed equipment-specific criteria for selecting and marking out blocks, determining which blocks should be mined with dilution and which should be written off as losses, depending on their metal grade. The geology team was trained in the calculations and the approach to marking out faces.
Results:
Improved excavation efficiency and a 1+% increase in metal in the ore through reduced dilution and lower losses.
Example of a simplified block model for marking out a mining face