Operational efficiency

and production systems
Our operational efficiency services help companies become more competitive by increasing productivity, improving processes and reducing costs intelligently.

Areas for improving

operational efficiency

Assessing improvement potential
Implementing a production system
Increasing production
Reducing losses and improving recovery
Optimising maintenance and implementing reliability management
Improving production planning
Improving logistics efficiency and reducing costs
Establishing an integrated operations centre
Challenges
our clients face
Declining equipment reliability and excessive downtime

Low productivity and excessive equipment downtime caused by ineffective maintenance, ageing assets and shortages of skilled personnel. Examples include declining equipment availability at underground mines following the withdrawal of Western equipment suppliers, high unplanned downtime in metallurgical operations and persistent shortfalls against vessel-loading plans at port terminals.

Failure to meet production plans

Production shortfalls caused by unstable processes, low hourly throughput and organisational delays. These include declining saleable-product recovery at processing plants, delays in developing access to new mine levels and failure to achieve planned ore grades.

Ineffective supply chain management

A lack of centralised supply chain management, consistent costing methods and visibility of route-level costs leads to poor logistics decisions, inappropriate inventory levels and idle equipment.

Our approach

to implementing improvements
1. Alignment and engagement
  • Agreeing a common approach and improvement priorities
  • Aligning roles and shared improvement objectives across all management levels
  • Building engagement through incentives and personal leadership
2. Management system
  • Detailed target setting
  • Standards, procedures and operating norms
  • Organisational structure, staffing, roles and incentives
  • Meeting cadence and reporting
  • Continuous improvement system
  • Leading by example
3. Initiative portfolio
  • Developing, evaluating and prioritising initiatives
  • Defining initiatives in detail, including resources and timelines
  • Managing implementation until benefits are fully realised and sustained
4. People development
  • Comprehensive training in leading management practices
  • Introducing regular performance reviews and implementing individual development plans
  • Classroom training and on-the-job coaching
/ Case studies

Practical results

that speak for themselves

Implementing a production system at Russia’s largest coal terminal
+16%
Implementing a production system at Russia’s largest coal terminal
Identifying potential to increase throughput by 25% at a major Russian port
+25%
Identifying potential to increase throughput by 25% at a major Russian port
Operational improvement project at the Hidden Valley gold mine in Papua New Guinea: exceeding the baseline plan by 11% and meeting a stretch target
+11%
Operational improvement project at the Hidden Valley gold mine in Papua New Guinea: exceeding the baseline plan by 11% and meeting a stretch target
Gold processing plant recovery 2.7 percentage points above budget
+2.7 pp
Gold processing plant recovery 2.7 percentage points above budget
Optimising the maintenance and repair budget
14%
Optimising the maintenance and repair budget
$1 million in annual cost savings at an apatite concentrate processing plant in Russia
−$1 million
$1 million in annual cost savings at an apatite concentrate processing plant in Russia
Reducing coal mine overheads
-46%
Reducing coal mine overheads
Reducing unplanned downtime on an upgraded production line
67%
Reducing unplanned downtime on an upgraded production line
Reducing operating costs at a gold mining operation in Africa
$16 million
Reducing operating costs at a gold mining operation in Africa
Supporting a company’s transformation planning to improve operational performance
Supporting a company’s transformation planning to improve operational performance
A 20–60% increase in coal terminal handling productivity
+26% to +60%
A 20–60% increase in coal terminal handling productivity
$180 million increase in EBITDA through cost reductions at an open-pit coal mine
-3%
$180 million increase in EBITDA through cost reductions at an open-pit coal mine
Detailed benchmarking identifies potential to increase labour productivity by 50–180% at a Russian coal mining operation
+180%
Detailed benchmarking identifies potential to increase labour productivity by 50–180% at a Russian coal mining operation
Potential identified to improve copper and molybdenum recovery by 0.5–1 percentage point at a flotation plant
+0.5–1.0 pp
Potential identified to improve copper and molybdenum recovery by 0.5–1 percentage point at a flotation plant
Identifying potential to increase NPV by 37% for an iron ore mine expansion project in Russia
+37%
Identifying potential to increase NPV by 37% for an iron ore mine expansion project in Russia
Reducing major maintenance shutdown duration by 14–33% in three production units at a mineral fertiliser plant in Russia
−14% to −33%
Reducing major maintenance shutdown duration by 14–33% in three production units at a mineral fertiliser plant in Russia
Identifying $200 million in potential value through a transformation programme for a chemical company’s project management office
+200$
Identifying $200 million in potential value through a transformation programme for a chemical company’s project management office
Organisational and technical improvements increased recovery by 4 percentage points at a processing plant in Russia
+4 pp
Organisational and technical improvements increased recovery by 4 percentage points at a processing plant in Russia
Increasing output by 30% at an underground mine through business improvements and a planning system
+30%
Increasing output by 30% at an underground mine through business improvements and a planning system
112% increase in mine development rates at Russia’s largest underground mine
+112%
112% increase in mine development rates at Russia’s largest underground mine
10% increase in output at Russia’s largest underground mine
+10%
10% increase in output at Russia’s largest underground mine
2.1 percentage-point increase in concentrate yield and flotation circuit start-up brought forward by 30 days at a coal preparation plant in Russia
+2.1 pp
2.1 percentage-point increase in concentrate yield and flotation circuit start-up brought forward by 30 days at a coal preparation plant in Russia
20% increase in mine development rates through daily reviews of development crews’ late arrivals and early departures
by 20%
20% increase in mine development rates through daily reviews of development crews’ late arrivals and early departures
Identifying the potential to increase mine development rates by 61% at a coal mining operation
+49% to +61%
Identifying the potential to increase mine development rates by 61% at a coal mining operation
53% improvement in a safety indicator by linking it to financial incentives
by 53%
53% improvement in a safety indicator by linking it to financial incentives
48% increase in mine development rates through the “Ideal Cycle” tool and supporting initiatives
up to 48%
48% increase in mine development rates through the “Ideal Cycle” tool and supporting initiatives
5S workplace organisation score increased from 31% to 71% through scheduled walkarounds and feedback
from 31% to 71%
5S workplace organisation score increased from 31% to 71% through scheduled walkarounds and feedback
14% increase in net conveyor operating time by improving daily performance review meetings
+14%
14% increase in net conveyor operating time by improving daily performance review meetings
40% reduction in downtime caused by material delivery delays through a standard procedure for replacing suspended monorail track beams
up to 40%
40% reduction in downtime caused by material delivery delays through a standard procedure for replacing suspended monorail track beams
19% increase in mineral fertiliser output at a Russian plant
+19%
19% increase in mineral fertiliser output at a Russian plant
Potential identified to increase overburden removal by 23% at an open-pit coal mine in Kazakhstan
+23%
Potential identified to increase overburden removal by 23% at an open-pit coal mine in Kazakhstan
Potential identified to bring a new longwall face into production 132 days earlier by increasing the mine development rate by 86%
−132 days
Potential identified to bring a new longwall face into production 132 days earlier by increasing the mine development rate by 86%
Programme developed to increase fertiliser output by 14% for a major ammonium nitrate producer in Russia
+14%
Programme developed to increase fertiliser output by 14% for a major ammonium nitrate producer in Russia
6.5% cost reduction through negotiations with contractors to lower existing road haulage rates
-6,5%
6.5% cost reduction through negotiations with contractors to lower existing road haulage rates
7.6-percentage-point increase in recovery at a gold flotation plant
+7.6 pp
7.6-percentage-point increase in recovery at a gold flotation plant
11.4% increase in apatite concentrate throughput through improved maintenance performance
+11,4%
11.4% increase in apatite concentrate throughput through improved maintenance performance
Major maintenance shutdown duration reduced by 12.9% at a phosphoric acid operation in Russia
by 12.9%
Major maintenance shutdown duration reduced by 12.9% at a phosphoric acid operation in Russia
Potential to increase throughput by 11% and recovery by 0.6 percentage points at a copper–nickel processing plant, with total benefits of up to RUB 75 billion
+11%
Potential to increase throughput by 11% and recovery by 0.6 percentage points at a copper–nickel processing plant, with total benefits of up to RUB 75 billion
3% increase in processing plant equipment availability through digital data collection tools
+3%
3% increase in processing plant equipment availability through digital data collection tools
Potential identified to reduce direct costs by 5% for a major fertiliser producer in Russia
5%
Potential identified to reduce direct costs by 5% for a major fertiliser producer in Russia
Potential identified to increase productivity by up to 14% at an underground mine
+14%
Potential identified to increase productivity by up to 14% at an underground mine
Potential identified to increase productivity by 12–19% at a phosphate fertiliser plant
12% to 19%
Potential identified to increase productivity by 12–19% at a phosphate fertiliser plant
Identifying $8.5 million in potential benefits from shorter well workovers for an oil producer
+$8.5 million
Identifying $8.5 million in potential benefits from shorter well workovers for an oil producer
Reducing longwall support relocation time by 9% at a coal mine in Russia
+5%
Reducing longwall support relocation time by 9% at a coal mine in Russia
Increasing development rates by 70%–180% at a coal mine in Russia
+70%-180%
Increasing development rates by 70%–180% at a coal mine in Russia
Identifying potential to increase EBITDA by 10% through a portfolio of initiatives at the company’s gold mining asset
+10% EBITDA
Identifying potential to increase EBITDA by 10% through a portfolio of initiatives at the company’s gold mining asset
An additional $15 million in net cash flow at a polymetallic ore processing plant in Kazakhstan
+$15 million per year
An additional $15 million in net cash flow at a polymetallic ore processing plant in Kazakhstan
A 51% increase in mineral fertiliser production at a plant in Russia
+51%
A 51% increase in mineral fertiliser production at a plant in Russia
Identifying potential to increase blister copper production by 10% and recovery by 0.5 percentage points at a major Russian metallurgical complex
+10%
Identifying potential to increase blister copper production by 10% and recovery by 0.5 percentage points at a major Russian metallurgical complex
Potential to increase throughput by 25% without capital expenditure at a port in Russia
+25%
Potential to increase throughput by 25% without capital expenditure at a port in Russia
A 15 percentage point increase in mobile equipment availability at an underground mine in Russia
+15 pp
A 15 percentage point increase in mobile equipment availability at an underground mine in Russia
A 50% reduction in concentrate losses at a fertiliser producer
50%
A 50% reduction in concentrate losses at a fertiliser producer
Identifying potential to increase an underground mine’s NPV by 35%
+35%
Identifying potential to increase an underground mine’s NPV by 35%
Reducing operational and technical downtime through data collection and variance reviews
by five hours per day
Reducing operational and technical downtime through data collection and variance reviews
Increasing mine production by more than 10% in 3 months by improving financial incentives
>10%
Increasing mine production by more than 10% in 3 months by improving financial incentives
Increasing concentrate yield by 1.3% and improving concentrate quality at a coal preparation plant
36 of 70+
Increasing concentrate yield by 1.3% and improving concentrate quality at a coal preparation plant
Increasing zinc concentrate output at a processing plant by 45%
+45%
Increasing zinc concentrate output at a processing plant by 45%
Increasing production at an underground lead-zinc mine by 80%
+80%
Increasing production at an underground lead-zinc mine by 80%
Reducing valuable mineral losses during processing by 15% through regular KPI variance reviews
-15%
Reducing valuable mineral losses during processing by 15% through regular KPI variance reviews
Increasing the production rate at an underground mine by 48% by introducing a mining work schedule
+48%
Increasing the production rate at an underground mine by 48% by introducing a mining work schedule
Increasing mineral fertiliser output at a Russian plant by 20%
+20%
Increasing mineral fertiliser output at a Russian plant by 20%
Increasing longwall productivity at a Russian coal mine by 16%
+16%
Increasing longwall productivity at a Russian coal mine by 16%
Identifying potential to increase throughput at a CIS processing plant by 1.5–3 million dry metric tonnes per year
+1.5–3 million dry metric tonnes per year
Identifying potential to increase throughput at a CIS processing plant by 1.5–3 million dry metric tonnes per year
Identified potential to shorten major maintenance shutdowns at sulphuric acid plants for mineral fertiliser production by 31%
31%
Identified potential to shorten major maintenance shutdowns at sulphuric acid plants for mineral fertiliser production by 31%
Identified the hidden logistics cost base in procurement contracts and potential to reduce it by 5–12%
5% to 12%
Identified the hidden logistics cost base in procurement contracts and potential to reduce it by 5–12%
Increasing rock movement by setting achievable, measurable shift targets
+4%
Increasing rock movement by setting achievable, measurable shift targets
Increasing gold processing plant throughput by 6.5% through more effective maintenance
+6,5%
Increasing gold processing plant throughput by 6.5% through more effective maintenance
Processing plant exceeded its budgeted targets despite a 2.5% shortfall before the project and a 5-day weather-related force majeure shutdown
+12%
Processing plant exceeded its budgeted targets despite a 2.5% shortfall before the project and a 5-day weather-related force majeure shutdown
Implementing a production system at Russia’s largest coal terminal
+16%
Implementing a production system at Russia’s largest coal terminal
Identifying potential to increase throughput by 25% at a major Russian port
+25%
Identifying potential to increase throughput by 25% at a major Russian port
Operational improvement project at the Hidden Valley gold mine in Papua New Guinea: exceeding the baseline plan by 11% and meeting a stretch target
+11%
Operational improvement project at the Hidden Valley gold mine in Papua New Guinea: exceeding the baseline plan by 11% and meeting a stretch target
Gold processing plant recovery 2.7 percentage points above budget
+2.7 pp
Gold processing plant recovery 2.7 percentage points above budget
Optimising the maintenance and repair budget
14%
Optimising the maintenance and repair budget
$1 million in annual cost savings at an apatite concentrate processing plant in Russia
−$1 million
$1 million in annual cost savings at an apatite concentrate processing plant in Russia
Reducing coal mine overheads
-46%
Reducing coal mine overheads
Reducing unplanned downtime on an upgraded production line
67%
Reducing unplanned downtime on an upgraded production line
Reducing operating costs at a gold mining operation in Africa
$16 million
Reducing operating costs at a gold mining operation in Africa
Supporting a company’s transformation planning to improve operational performance
Supporting a company’s transformation planning to improve operational performance
A 20–60% increase in coal terminal handling productivity
+26% to +60%
A 20–60% increase in coal terminal handling productivity
$180 million increase in EBITDA through cost reductions at an open-pit coal mine
-3%
$180 million increase in EBITDA through cost reductions at an open-pit coal mine
Detailed benchmarking identifies potential to increase labour productivity by 50–180% at a Russian coal mining operation
+180%
Detailed benchmarking identifies potential to increase labour productivity by 50–180% at a Russian coal mining operation
Potential identified to improve copper and molybdenum recovery by 0.5–1 percentage point at a flotation plant
+0.5–1.0 pp
Potential identified to improve copper and molybdenum recovery by 0.5–1 percentage point at a flotation plant
Identifying potential to increase NPV by 37% for an iron ore mine expansion project in Russia
+37%
Identifying potential to increase NPV by 37% for an iron ore mine expansion project in Russia
Reducing major maintenance shutdown duration by 14–33% in three production units at a mineral fertiliser plant in Russia
−14% to −33%
Reducing major maintenance shutdown duration by 14–33% in three production units at a mineral fertiliser plant in Russia
Identifying $200 million in potential value through a transformation programme for a chemical company’s project management office
+200$
Identifying $200 million in potential value through a transformation programme for a chemical company’s project management office
Organisational and technical improvements increased recovery by 4 percentage points at a processing plant in Russia
+4 pp
Organisational and technical improvements increased recovery by 4 percentage points at a processing plant in Russia
Increasing output by 30% at an underground mine through business improvements and a planning system
+30%
Increasing output by 30% at an underground mine through business improvements and a planning system
112% increase in mine development rates at Russia’s largest underground mine
+112%
112% increase in mine development rates at Russia’s largest underground mine
10% increase in output at Russia’s largest underground mine
+10%
10% increase in output at Russia’s largest underground mine
2.1 percentage-point increase in concentrate yield and flotation circuit start-up brought forward by 30 days at a coal preparation plant in Russia
+2.1 pp
2.1 percentage-point increase in concentrate yield and flotation circuit start-up brought forward by 30 days at a coal preparation plant in Russia
20% increase in mine development rates through daily reviews of development crews’ late arrivals and early departures
by 20%
20% increase in mine development rates through daily reviews of development crews’ late arrivals and early departures
Identifying the potential to increase mine development rates by 61% at a coal mining operation
+49% to +61%
Identifying the potential to increase mine development rates by 61% at a coal mining operation
53% improvement in a safety indicator by linking it to financial incentives
by 53%
53% improvement in a safety indicator by linking it to financial incentives
48% increase in mine development rates through the “Ideal Cycle” tool and supporting initiatives
up to 48%
48% increase in mine development rates through the “Ideal Cycle” tool and supporting initiatives
5S workplace organisation score increased from 31% to 71% through scheduled walkarounds and feedback
from 31% to 71%
5S workplace organisation score increased from 31% to 71% through scheduled walkarounds and feedback
14% increase in net conveyor operating time by improving daily performance review meetings
+14%
14% increase in net conveyor operating time by improving daily performance review meetings
40% reduction in downtime caused by material delivery delays through a standard procedure for replacing suspended monorail track beams
up to 40%
40% reduction in downtime caused by material delivery delays through a standard procedure for replacing suspended monorail track beams
19% increase in mineral fertiliser output at a Russian plant
+19%
19% increase in mineral fertiliser output at a Russian plant
Potential identified to increase overburden removal by 23% at an open-pit coal mine in Kazakhstan
+23%
Potential identified to increase overburden removal by 23% at an open-pit coal mine in Kazakhstan
Potential identified to bring a new longwall face into production 132 days earlier by increasing the mine development rate by 86%
−132 days
Potential identified to bring a new longwall face into production 132 days earlier by increasing the mine development rate by 86%
Programme developed to increase fertiliser output by 14% for a major ammonium nitrate producer in Russia
+14%
Programme developed to increase fertiliser output by 14% for a major ammonium nitrate producer in Russia
6.5% cost reduction through negotiations with contractors to lower existing road haulage rates
-6,5%
6.5% cost reduction through negotiations with contractors to lower existing road haulage rates
7.6-percentage-point increase in recovery at a gold flotation plant
+7.6 pp
7.6-percentage-point increase in recovery at a gold flotation plant
11.4% increase in apatite concentrate throughput through improved maintenance performance
+11,4%
11.4% increase in apatite concentrate throughput through improved maintenance performance
Major maintenance shutdown duration reduced by 12.9% at a phosphoric acid operation in Russia
by 12.9%
Major maintenance shutdown duration reduced by 12.9% at a phosphoric acid operation in Russia
Potential to increase throughput by 11% and recovery by 0.6 percentage points at a copper–nickel processing plant, with total benefits of up to RUB 75 billion
+11%
Potential to increase throughput by 11% and recovery by 0.6 percentage points at a copper–nickel processing plant, with total benefits of up to RUB 75 billion
3% increase in processing plant equipment availability through digital data collection tools
+3%
3% increase in processing plant equipment availability through digital data collection tools
Potential identified to reduce direct costs by 5% for a major fertiliser producer in Russia
5%
Potential identified to reduce direct costs by 5% for a major fertiliser producer in Russia
Potential identified to increase productivity by up to 14% at an underground mine
+14%
Potential identified to increase productivity by up to 14% at an underground mine
Potential identified to increase productivity by 12–19% at a phosphate fertiliser plant
12% to 19%
Potential identified to increase productivity by 12–19% at a phosphate fertiliser plant
Identifying $8.5 million in potential benefits from shorter well workovers for an oil producer
+$8.5 million
Identifying $8.5 million in potential benefits from shorter well workovers for an oil producer
Reducing longwall support relocation time by 9% at a coal mine in Russia
+5%
Reducing longwall support relocation time by 9% at a coal mine in Russia
Increasing development rates by 70%–180% at a coal mine in Russia
+70%-180%
Increasing development rates by 70%–180% at a coal mine in Russia
Identifying potential to increase EBITDA by 10% through a portfolio of initiatives at the company’s gold mining asset
+10% EBITDA
Identifying potential to increase EBITDA by 10% through a portfolio of initiatives at the company’s gold mining asset
An additional $15 million in net cash flow at a polymetallic ore processing plant in Kazakhstan
+$15 million per year
An additional $15 million in net cash flow at a polymetallic ore processing plant in Kazakhstan
A 51% increase in mineral fertiliser production at a plant in Russia
+51%
A 51% increase in mineral fertiliser production at a plant in Russia
Identifying potential to increase blister copper production by 10% and recovery by 0.5 percentage points at a major Russian metallurgical complex
+10%
Identifying potential to increase blister copper production by 10% and recovery by 0.5 percentage points at a major Russian metallurgical complex
Potential to increase throughput by 25% without capital expenditure at a port in Russia
+25%
Potential to increase throughput by 25% without capital expenditure at a port in Russia
A 15 percentage point increase in mobile equipment availability at an underground mine in Russia
+15 pp
A 15 percentage point increase in mobile equipment availability at an underground mine in Russia
A 50% reduction in concentrate losses at a fertiliser producer
50%
A 50% reduction in concentrate losses at a fertiliser producer
Identifying potential to increase an underground mine’s NPV by 35%
+35%
Identifying potential to increase an underground mine’s NPV by 35%
Reducing operational and technical downtime through data collection and variance reviews
by five hours per day
Reducing operational and technical downtime through data collection and variance reviews
Increasing mine production by more than 10% in 3 months by improving financial incentives
>10%
Increasing mine production by more than 10% in 3 months by improving financial incentives
Increasing concentrate yield by 1.3% and improving concentrate quality at a coal preparation plant
36 of 70+
Increasing concentrate yield by 1.3% and improving concentrate quality at a coal preparation plant
Increasing zinc concentrate output at a processing plant by 45%
+45%
Increasing zinc concentrate output at a processing plant by 45%
Increasing production at an underground lead-zinc mine by 80%
+80%
Increasing production at an underground lead-zinc mine by 80%
Reducing valuable mineral losses during processing by 15% through regular KPI variance reviews
-15%
Reducing valuable mineral losses during processing by 15% through regular KPI variance reviews
Increasing the production rate at an underground mine by 48% by introducing a mining work schedule
+48%
Increasing the production rate at an underground mine by 48% by introducing a mining work schedule
Increasing mineral fertiliser output at a Russian plant by 20%
+20%
Increasing mineral fertiliser output at a Russian plant by 20%
Increasing longwall productivity at a Russian coal mine by 16%
+16%
Increasing longwall productivity at a Russian coal mine by 16%
Identifying potential to increase throughput at a CIS processing plant by 1.5–3 million dry metric tonnes per year
+1.5–3 million dry metric tonnes per year
Identifying potential to increase throughput at a CIS processing plant by 1.5–3 million dry metric tonnes per year
Identified potential to shorten major maintenance shutdowns at sulphuric acid plants for mineral fertiliser production by 31%
31%
Identified potential to shorten major maintenance shutdowns at sulphuric acid plants for mineral fertiliser production by 31%
Identified the hidden logistics cost base in procurement contracts and potential to reduce it by 5–12%
5% to 12%
Identified the hidden logistics cost base in procurement contracts and potential to reduce it by 5–12%
Increasing rock movement by setting achievable, measurable shift targets
+4%
Increasing rock movement by setting achievable, measurable shift targets
Increasing gold processing plant throughput by 6.5% through more effective maintenance
+6,5%
Increasing gold processing plant throughput by 6.5% through more effective maintenance
Processing plant exceeded its budgeted targets despite a 2.5% shortfall before the project and a 5-day weather-related force majeure shutdown
+12%
Processing plant exceeded its budgeted targets despite a 2.5% shortfall before the project and a 5-day weather-related force majeure shutdown
/ Insights

Insights and perspectives

Geotechnical engineering as a strategic function in mining companies
21.01.2026
In this insight, we explain why geotechnical engineering needs to become a strategic function in mining companies, balancing the drive to maximise production with the management of collapse and accident risks. Drawing on a completed project, we show how a systematic approach to geotechnical engineering can unlock additional asset value and create a long-term competitive advantage.
The coal industry outlook: an era of uncertainty
23.10.2025
The coal market is in a downturn. Russian companies face pressure on two fronts: logistics absorbs up to 80% of revenue, while discounts to global prices are widening. We examine three strategic levers for maintaining profitability and share a case study: how fixed costs were reduced by 36% in 7 months, keeping two loss-making assets open.
Reducing costs as demand falls
25.07.2025
Russia’s metals industry faces falling demand and lower prices, which are squeezing profits. In this insight, we examine the main areas for cost reduction to improve business profitability and maintain a sound cash position.
Optimising mining operations: improving drill and blast performance in open-pit mining and reducing ore losses
30.06.2025
In this insight, we discuss how to improve drill and blast performance in open-pit mining and reduce ore losses.

Read Pieff
on social media

Practical case studies and current events. Business development tools and methods. Expert analysis and people’s stories.